INSTALLATION
Commissioning
10.2 Alternative installation methods
10.2.1 Power cable on finished walls
Material losses
!
If you break open the wrong knock-out in the appliance
cover by mistake, you must use a new appliance cover.
f Cleanly cut or break out the required opening in the appli-
f
ance cover (see chapter "Installation / Specification / Dimen-
sions and connections"). If necessary, use a file.
f Route the power cable through the cable grommet. Connect
f
the power cable to the mains terminal.
10.2.2 Connecting a load shedding relay
Install a load shedding relay in the distribution board in conjunc-
tion with other electric appliances, e.g. electric storage heaters.
The relay responds when the instantaneous water heater starts.
Material losses
!
Connect the phase that switches the load shedding relay
to the indicated terminal of the mains terminal in the ap-
pliance (see chapter "Installation / Specification / Wiring
diagram").
10.2.3 Water installation on finished walls
24
18 Nm
f To seal the connection on unfinished walls, fit the water
f
plugs with gaskets.
f Fit a suitable pressure tap.
f
1
1 Openings
24
|DHF-C
2 Cover guides
3 Lower fixing screw
!
f Secure the back panel with an additional screw at the
f
bottom.
f Secure the connection pipes to the appliance.
f
f Cleanly break out the knock-outs in the appliance cover. If
f
necessary, use a file.
f Click the cover guides into place in the openings.
f
10.3 Completing the installation
f Open the shut-off valve in the tee.
f
11. Commissioning
11.1 Initial start-up
19
5 Nm
3
2
f Open and close all connected draw-off valves several times,
f
until all air has been purged from the pipework and the
appliance.
Material losses
If you cut open the wrong knock-out in the appliance
cover by mistake, you must use a new appliance cover.
WARNING Electrocution
Commissioning must only be carried out by a qualified
contractor in accordance with safety regulations.
compact contr ol
www.stiebel-eltron.com
compa ct con tr ol