Step 8 Level Unit - Monogram ZIR241NPNII Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions - Dual Integrated Installation
STEP 7 INSERTING/SECURING
INTO CABINET SURROUND (Cont.)
Replace the waterline strain relief screw.
Strain Relief
Screw
Store the excess string, and water tubing under
the unit.
WARNING
Electrical Shock Hazard.
Replace waterline strain relief in front rail location as
shown.

STEP 8 LEVEL UNIT

All models have 4-point leveling. The front is supported
by leveling legs; the rear is supported by adjustable
wheels. Both are accessible from the front of the unit.
To level the back of the unit, turn the 7/16" hex nut
located above the front wheels. Turn clockwise to
raise or counterclockwise to lower the unit.
For front leveling, use a 7/16" open-end wrench.
Adjust height of unit to match installation cutout
opening 84". The unit should be level and plumb with
cabinetry.
Hex nut adjusts
rear wheels
Open-end wrench
adjusts front
leveling legs
NOTICE: The rear leveling wheels and front leveling
legs are limited to a maximum height adjustment of 1".
If the installation requires more than 84" height, the
installer should elevate the unit on a sheet of plywood
or runners. Cabinetry trim could also be added across
the top of the opening to shorten the opening. If you
attempt to raise the unit more than 1", you will damage
the front leveling legs and the rear leveling wheels.
20
31-1000190 Rev. 2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Zif181npniiZdbr240nbs

Table des Matières