Commissioning; Preparation - Stiebel Eltron DHE 18/21/24 Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 105
INSTALLATIoN

Commissioning

11. Commissioning

11.1 Preparation

Internal anti-scalding protection via jumper slot
f Install the anti-scalding protection setting jumper in the re-
f
quired position (= temperature in °C) on the pin strip.
Jumper position
Description
43
For example in nurseries, hospitals, etc.
50
55
Max. for shower operation
60
Factory setting
No jumper
Limited to 43 °C
www.stiebel-eltron.com
43
50
55
60
CAUTION Burns
If operating with preheated water, e.g. if using a solar
thermal system, the internal anti-scalding protection and
the temperature limit Tmax, which can be set by the user,
may be exceeded.
f In this case, limit the temperature with an upstream
f
central thermostatic valve (e.g. ZTA 3/4).
DHE |
81

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dhe 27

Table des Matières