Preparation; Installation Site - Stiebel Eltron DHE 18/21/24 Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 105
INSTALLATIoN

Preparation

Pipe assembly for offset installation
Use this pipe assembly if you intend to offset the appliance by up
to 90 mm downwards from the water connection.
Pipe assembly for replacing a gas water heater
You will need this pipe assembly set if the existing installation
has gas water heater connections (cold water connection on the
left-hand side, DHW connection on the right-hand side).
Pipe assembly for DHB water plug-in couplings
Use the water plug-in couplings if the existing installation contains
water plug-in connections from a DHB water heater.
Load shedding relay (LR 1-A)
The load shedding relay for installation in the distribution board
provides priority control for the instantaneous water heater when
other appliances, such as electric storage heaters, are being op-
erated simultaneously.
Central thermostatic valve (ZTA 3/4)
Use the thermostatic valve for central premixing, for example
when operating an instantaneous water heater with preheated
water. For use in shower operation, the valve must be set to a
maximum of 55 °C.
74
| DHE
9.
Preparation
9.1

Installation site

Material losses
!
Install the appliance in a room that is free from the risk
of frost.
f Always install the appliance vertically and near the draw-off
f
point. For horizontal installation, see chapter "Installation
alternatives / Horizontal installation of the appliance".
The appliance is suitable for undersink and oversink installation.
Undersink installation
1 Cold water inlet
2 DHW outlet
1
2
www.stiebel-eltron.com

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dhe 27

Table des Matières