Initial Start-Up - Stiebel Eltron DHE 18/21/24 Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 105
INSTALLATIoN
Commissioning
Changing the connected load via jumper slot; only with
DHE 18/21/24
If you select a connected load other than the 21 kW factory setting
for appliances with selectable connected load, you will need to
reposition the jumper.
f Install the jumper in the required position on the pin strip.
f
Jumper position
Connected load
1
18 kW
2
21 kW
3
24 kW
No jumper
18 kW
82
| DHE
1
2
3

11.2 Initial start-up

f Open and close all connected draw-off valves several times,
f
until all air has been purged from the pipework and the
appliance.
f Carry out a tightness check.
f
f Activate the safety switch by firmly pressing the reset button
f
(the appliance is delivered with the safety switch disabled).
≥ 60 s
www.stiebel-eltron.com

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dhe 27

Table des Matières