Commissioning; Preparation - Stiebel Eltron DHB-E 11/13 LCD Utilisation Et Installation

Masquer les pouces Voir aussi pour DHB-E 11/13 LCD:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 40
INsTALLATIoN

Commissioning

f Pull the cable grommet over the cable sheath of the power
f
cable. For large cable cross-sections, enlarge the hole in the
cable grommet if necessary.
f Remove the transport protection plugs from the appliance
f
pipe connections.
f Bend the power cable 45° upwards.
f
f Route the power cable and cable grommet through the back
f
panel from the rear.
f Install the appliance on the threaded studs of the wall
f
mounting bracket.
f Press the back panel firmly into place, aligning it correctly.
f
f Lock the fixing toggle by turning it 90° clockwise.
f
f Pull the cable grommets into the back panel, until both lock-
f
ing tabs engage.
19
3 Nm
5 Nm
f Fit the pipe connections with flat gaskets onto the water
f
connections.
f Open the 3-way ball shut-off valve or the shut-off valve in the
f
cold water supply line.
Making the electrical connection
WARNING Electrocution
Carry out all electrical connection and installation work
in accordance with relevant regulations.
WARNING Electrocution
The connection to the power supply must be in the form
of a permanent connection in conjunction with the re-
movable cable grommet. Ensure the appliance can be
separated from the power supply by an isolator that dis-
connects all poles with at least 3 mm contact separation.
WARNING Electrocution
Ensure that the appliance is earthed.
www.stiebel-eltron.com
24
Material losses
!
Observe the type plate. The specified rated voltage must
match the mains voltage.
f Connect the power cable to the mains terminal.
f
Fitting the lower back panel section
1
1 Diffuser on lower back panel
f Fit the lower back panel section into the back panel. Check
f
that both locking tabs are engaged.
f Align the mounted appliance by undoing the fixing toggle,
f
aligning the power supply and back panel, and then re-tight-
ening the fixing toggle. If the back panel does not sit flush
against the wall, you can secure the appliance at the bottom
with an additional screw.
Material losses
!
Do not bend the diffuser on the lower back panel when
installing.
11. Commissioning

11.1 Preparation

43 50 55 60
11 13
2
1 Jumper for anti-scalding protection setting
2 Jumper for connected load: DHB-E 11/13 LCD
3 Jumper for connected load: DHB-E 18/21/24 LCD
Internal anti-scalding protection via jumper slot
Jumper position
Description
43
For example, nurseries, hospitals etc.
50
55
Max. for shower operation
60
Factory setting
No jumper
Limited to 43 °C
f Install the anti-scalding protection setting jumper in the re-
f
quired position (= temperature in °C) on the pin strip.
1
43 50 55 60
18 21 24
3
DHB-E LCD |
31

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dhb-e 18 lcd 25aDhb-e 18/21/24 lcdDhb-e 27 lcd

Table des Matières