Minimum Clearances; Water Installation - Stiebel Eltron DHE 18/21/24 Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 105
INSTALLATIoN
Preparation
Oversink installation
2
1 Cold water inlet
2 DHW outlet
Note
f Mount the appliance on the wall. The wall must have
f
sufficient load bearing capacity.
www.stiebel-eltron.com
1
9.2

Minimum clearances

≥50
f Maintain the minimum clearances to ensure trouble-free op-
f
eration of the appliance and facilitate maintenance work.
9.3

Water installation

f Flush the water line thoroughly.
f
Fittings
Use appropriate pressure taps. Open vented taps are not per-
missible.
Note
Never use the 3-way ball shut-off valve in the cold water
inlet to reduce the flow rate. The 3-way ball shut-off valve
is intended only to shut off the cold water inlet.
≥50
DHE |
75

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dhe 27

Table des Matières