MINN KOTA RIPTIDE ULTERRA Instructions D'installation page 12

Masquer les pouces Voir aussi pour RIPTIDE ULTERRA:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLING THE RIPTIDE ULTERRA
6
ITEM(S) NEEDED
#7 x 6
WARNING
Do not deploy the motor until it is fully mounted to the boat.
Illustrations are for reference only. Deploying your motor
before it is mounted to the boat may cause injury.
i.
Make sure the slot on the underside of the Base
Extrusion is aligned with the outermost part of
the gunwale of the boat. This will ensure that the
Shaft has a minimum clearance of 1-1/2" when
it is deployed. The lower unit when stowed and
deployed must not encounter any obstructions.
j.
Check to be sure that the Mount is level. Use the
Rubber Washers (Item #7) provided to create a
level surface if necessary.
Gunwale
7
k. It is recommended to mark at least 4 of the 6
holes in the Base Extrusion to have a minimum
of two bolts on each side that are located the
farthest apart. Ideal installation would allow for
6 bolts to be used, with a minimum of 4.
l.
Make sure the area under the mounting location
is clear to drill holes and install nuts and washers.
Drill through the marked holes using a
drill bit.
8 | minnkotamotors.com
1-1/2"
Minimum
Shaft
"
9/32
Base
Extrusion
Slot
Gunwale
Mounting Holes
Mounting Slots
Slot
Gunwale
Bow
Base Extrusion
©2016 Johnson Outdoors Marine Electronics, Inc.

Publicité

Table des Matières
loading

Table des Matières