2. On the OPEX Host Run screen, click START (Figure 4-15). At this point, the
conveyors will start to run, and the iBOTs will cycle, so that they maintain
their charge in preparation for delivering items to bins.
3. For the duration of the run, you will use the OPEX Induct ELC software to
view the process (see
page
142).
122
Figure 4-15: OPEX Host Run screen
"Toggling between the Host & InductELC software" on
Sure Sort™ Operator Manual
OPEX Corporation
Operation