Kessel Aqualift S Compact Notice D'utilisation D'origine page 46

Masquer les pouces Voir aussi pour Aqualift S Compact:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 59
Install additional pipes (max. DN100) if necessary
L Additional connections (additional inlet, aeration and ventilation pipe)
must be installed at the same height or higher than the pre-drilled inlets.
Only the marked areas shall be drilled.
1 If there is no ventilation through the cover plate, a separate aeration and
ventilation pipe (via the roof) must be installed.
▶ Draw in desired connections, check alignment.
▶ Select drill with appropriate hole saw (Art. no. 500101).
▶ Have appropriate seal at the ready (available as accessories).
▶ Carry out drilling and fitting of the seal in accordance with the hole saw
instructions. ➊➋
4.5
Routing the pressure connection out
▶ Clip pressure pipe set (Art. no. 28040, 28062) onto the pressure output.
✓ The socket can be clearly heard to latch in place.
▶ Route the pressure pipe over the backwater level.
L Alternatively, the pressure connection can also be bonded with a PVC-U
pipe (DN32).
46
Installation and operating manual
2
010-090
1
Fig. [11]
Fig. [12]
016-059

Publicité

Table des Matières
loading

Table des Matières