HANDLING AND INSTALLATION
WARNING: Before doing any work,
cut off the general power supply.
The manufacturer has tested the appliance
with its own mains gas, identifi ed by the sticker
applied to the nameplate.
If the type of gas to be connected is diff erent
from that used for testing, proceed as follows.
Turn off the gas supply tap (A).
)
Change the top burner nozzles (see page 16).
)
Change the top burner pilot light nozzles
)
(see page 17).
Adjust the minimum settings of the gas con-
)
trol valves of the top burners (see page 14).
Remove the testing gas sticker from the
)
nameplate (B) and apply the new one to
identify the gas being used.
Remove the sticker from the appliance and
)
apply the new one (C) with the category of
the country of installation.
NOTE: After completing the operation,
check for any gas leaks or faults.
WARNING: Before it is put into servi-
ce, the system must be tested to check the
operating conditions of every single compo-
nent and identify any malfunctions. In this
stage, it is important to check that all health
and safety requirements have been com-
plied with in full.
To test the system, make the following checks:
Check that the mains voltage is the same as
)
that of the appliance.
3320060_inst_GB_rev.4
CONVERSION OF GAS SUPPLY
C
B
TESTING OF THE APPLIANCE
AL
II2H3B/P: G20/20mbar, G30/30mbar
AL
II2H3+: G20/20mbar, G30-G31/28_30-37mbar
AT
II2H3B/P: G20/20mbar, G30/50mbar
AT
II2H3P: G20/20mbar, G31/50mbar
BE
II2E+3+: G20-G25/20-25mbar, G30-G31/28_30-37mbar
BE
II2E+3B/P: G20-G25/20-25mbar, G30/30mbar
BE
II2E+3P: G20-G25/20-25mbar, G31/37mbar
BE
II2E+3B: G20-G25/20-25mbar, G30/30mbar
BG
II2H3B/P: G20/20mbar, G30/30mbar
BG
II2H3+: G20/20mbar, G30-G31/28_30-37mbar
CH
II2H3+: G20/20mbar, G30-G31/28_30-37mbar
A
G20
m3/h
mbar
G31
kW
G25
m3/h
mbar
kW
G30
mbar
kW
Kg/h
G20
m3/h
mbar
G31
kW
G25
m3/h
mbar
kW
G30
mbar
kW
Kg/h
Operate the appliance's circuit-breaker to
)
check the electrical connection.
Turn on the gas supply tap and check that
)
the connections are right.
Check that the mains gas is the same as that
)
used for commissioning of the appliance,
and carry out the conversion procedure if ne-
cessary (see page 13).
ENGLISH
IS
II2H3B/P: G20/20mbar, G3
IS
II2H3+: G20/20mbar, G30-G31
3P
IT
II2H3+: G20/20mbar, G30-G31
IT
II2H3B/P: G20/20mbar, G3
IT
II2H3P: G20/20mbar, G3
LT
II2H3+: G20/20mbar, G30-G31
LT
II2H3B/P: G20/20mbar, G3
LT
II2H3P: G20/20mbar, G3
LU
II2H3B/P: G20/20mbar, G3
LU
II2H3+: G20/20mbar, G30-G31
LV
II2H3B/P: G20/20mbar, G3
mbar
kW
Kg/h
~
~
mbar
kW
Kg/h
~
~
01
TYPE
01
TYPE
13

Publicité

loading