Télécharger Imprimer la page

Vortice VORT HRI 200 PHANTOM BP IoT Notice D'emploi Et D'entretien page 41

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6.3
Accessibility
The appliance must be easily accessible for service/maintenance work. In particular, the false ceiling housing the appliance must
have an inspection hatch of an adequate size to allow access to the electrical/electronic parts and filters. In this way, the appliance
will not have to be removed from the false ceiling for either routine maintenance operations (filter replacement) or some special
operations (e.g. replacement of a motor fan or electronic controller).
6.4
Electrical box inputs
Fig. 9A
1. Remote control panel.
2. Modbus.
3. Boost switch connection.
4. Power supply.
5. Pre-heater (to connect the pre-heater, it is necessary to open the electrical box and make
the connection via the dedicated two-pole terminal block (refer to the connection diagram
in figure 10).
Fig. 9B
6. Thermal actuator (bypass open).
7. Thermal actuator (bypass closed).
7
Electrical connections (fig.10)
10
PE
MAINS
220-240V
L
~50Hz
N
2
3
4
5
Wire colour code:
WH=white
BK=black
YE= yellow
BK=blue
BN=brown
GNYE=yellow
RD=red
1
220-240V
~50Hz
BN
VCC
WH
GND
GN
D+
YE
D-
9
B
6
7
GNYE
BN
BU
BU
BN
1.
Mains 2 poles switch
2.
Pre-heater
3.
Dry contact (remote switch/relay)
4.
Remote HMI
5.
Modbus
ENGLISH
1 2
A
3
5
4
41

Publicité

loading

Ce manuel est également adapté pour:

Vort hri 200 phantom bp iot hVort hri 350 phantom bp iot