Keep the original packing in good conditions to be used if the equipment has to be
shipped in the future.
3. UNPACKING / ASSEMBLY
Pay careful attention when unpacking, assembling, handling and installing the ma-
chine as described below. Failure to observe these instructions could damage the
machine and compromise operator safety.
Before removing the machine from the pallet, make sure the items shown below have
been removed from the pallet.
Remove the upper part of the packing and
make sure that the machine has not suffered
damage in transit; identify the points at
which the machine is anchored to the pallet.
- The machine comprises five main units
(fig.4):
1 tower
2 air tank (T.I. version only)
3 box with pressure gauge (T.I. version only)
4 column guard
5 body
- After removing the tower 1, it is advisable to
place it in a horizontal position to prevent
it from falling and getting damaged.
- Remove the side cover.
- Insert the air hose G (fig. 5) into hole A
behind the column tilting cylinder.
- Apply pin B (fig. 5) into hole C (fig. 5) and
lock it using the screws and washers D (fig. 5).
- Insert pin E (fig. 5) into hole F (fig. 5) and into U-bolt F1 (fig. 5) on the tower tilt cylinder
and lock with ring M (fig. 5).
- Connect pipe G (fig. 5) to the intermediate union connected to the column lifting valve
H (fig. 5).
- Fit the hose connector of the tank 2 into hose Q (fig. 5), fasten the tank 2 to the machine
with nuts and washers R (fig. 5), and tighten the clamp O (fig. 5) onto the hose Q (fig.
AS 924 - AS 924 A Operator's Manual
CAUTION
CAUTION
CAUTION
4
UK
89