1
2
3
4
5
6
7
Fig. 13: Control panel EcoPro
1.
Install the mounting plate and pump in the required location and installation scenario.
Ä Chapter 6 'Assembly and connection' on page 27
2.
Make the hydraulic connections.
Ä Chapter 6.2.1 'Hydraulic installation' on page 32
3.
If necessary, make the electrical connections for signal inputs.
Ä Chapter 6.2.2 'Electrical installation' on page 40
4.
Connect the mains plug (fitted at the factory) to the power supply.
5.
Switch on the pump using the On/Off button .
6.
Change the viscosity by pressing the On/Off
(for about 3 seconds).
The pump must be switched off to change operating modes.
ð The LED that corresponds to the selected viscosity briefly flashes green.
7.
Press the On/Off button to switch on the pump
ð The pump resumes operation and the LED for the new viscosity setting flashes.
8.
The first time you use the pump:
n
Bleed the pipes
Ä Chapter 7.3 'Venting the metering pump' on page 47
see
n
Perform a volumetric measurement of the pump:
Ä Chapter 7.4 'Volumetric measurement for the pump' on page 48
Rotary knob for adjusting the dosage rate
1
Locking mechanism for fixing the rotary button in place
2
LED – Alarm signal, colour: red flashing
3
LED – Operating status / metering mode: Viscosity low
4
(left LED)
LED – Operating status / metering mode: Viscosity high
5
(right LED)
On/Off button
6
Test button
7
and 'Test'
.
45
Start-up
buttons simultaneously
MAN046879 Rev. 12-01.2024