Télécharger Imprimer la page

Ecolab EcoPro Manuel D'utilisation page 129

Masquer les pouces Voir aussi pour EcoPro:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6
Assembly and connection
Personnel:
Protective equipment:
NOTICE!
Instructions for installation and assembly:
– Select an easily accessible location that is protected against frost.
– Always comply with the ambient conditions specified in
"Technical Data" .
– The pump must be installed in a horizontal position.
– Special measures and protective equipment for metering hazardous or
aggressive chemicals are not listed here.
CAUTION!
Neither the overflow line nor the vent line is permitted to be fed back into the
metering pump suction tube! When connecting the suction and pressure tubes,
make sure that the O-rings are mounted on the connections in order to achieve
the necessary sealing.
NOTICE!
Material damage by using incorrect tools!
Material damage may arise by using incorrect tools. Use the correct tools.
DANGER!
Damage and injuries may occur if installation, maintenance or repair
work is carried out incorrectly.
– All installation, maintenance and repair work may only be performed by
authorised and trained experts in accordance with valid local regulations.
– The safety regulations and the required protective clothing when working
with chemicals must be complied with. Attention must be paid to the
information included on the product data sheet for the metering medium
used.
– The metering medium supply must be isolated and the system cleaned
prior to installation, maintenance and repair work.
Personal protective equipment
DANGER!
Personal protective equipment (PPE) is used to protect personnel.
The personnel who set up and install the pump must use suitable PPE to
protect against injury.
n
Mechanic
n
Qualified electrician
n
Service personnel
n
Specialist
n
Protective gloves
n
Protective eyewear
n
Safety shoes
27
Assembly and connection
Ä Chapter
MAN046879 Rev. 12-01.2024

Publicité

loading