All manuals and user guides at all-guides.com
SDN6020
SDN6030
6-2
HEAT EXCHANGER
INSPECTION
1. Inspect:
•
Coolant hoses 1
•
Heat exchangers 2
•
Joint pipe 3
•
Coolant reservoir tank 4
•
Carburetor heating hoses 5
Cracks/damage → Replace.
2. Measure:
•
Filler cap opening pressure
Cap opens with a pressure below the speci-
fied pressure → Replace.
Cap opening pressure:
100 ~ 120 kPa
2
(1.0 ~ 1.2 kg/cm
, 14 ~ 17 psi)
Measurement steps:
•
Attach the cooling system tester 1 to the
coolant filler cap 2.
Cooling system tester:
90890-01325, YU-24460-01
•
Apply the specified pressure for 10 seconds
and make sure there is no pressure drop.
INSTALLATION
1. Install:
•
Heat exchangers
Use the rivet gun.
COOL