Commissioning
Initial filling of the evaporation flask
Complete the following steps for filling the evaporation flask to ensure continuous supply of the
educt during operation:
➜
Turn on the rotary evaporator and wait for the software to initialize (start screen appears on
the control panel).
➜
Switch on the heating bath heater and the recirculation chiller.
➜
Turn on Distimatic Pro and wait for the software to initialize (start screen appears on the
control panel).
➜
Start any given process by touching the
the Distimatic Pro.
➜
Open the inlet valve on the educt sensor vessel.
➜
Close the inlet valve when the displayed level is reached
Start process
button on the control panel of
.
104