Télécharger Imprimer la page

Checchi & Magli DUAL 12 GOLD Manuel D'utilisation Et D'entretien page 88

Masquer les pouces Voir aussi pour DUAL 12 GOLD:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Replacing the planting unit chain
E
F
UN41-0565BN
Proceed as outlined below.
1)
Loosen the screws (A) and remove the casing (B).
2)
Unscrew the nuts (C) and remove the casing (D).
3)
Unscrew the nuts (E) and remove the casing (F).
4)
Use the tensioner (G) to slacken the chain.
CAUTION
The tensioner could move unexpectedly, causing in-
jury to the hands.
Proceed with the utmost caution.
English language
INFORMATION CONCERNING REPLACEMENTS
5)
6)
7)
8)
NOTICE
Take special care to fit the link correctly and in the
direction indicated in the figure.
9)
10) Fit the casing (D) and tighten the nuts (C).
11) Fit the casing (B) and tighten the screws (A).
40
C
A
D
G
Remove the joining link (H).
Remove the chain from the pinions.
Fit the new chain on the pinions and on the chain
tensioner (G).
Fit the joining link (H).
Fit the casing (F) and tighten the nuts (E).
8
B
H
Use and maintenance

Publicité

loading