Stone Formations - probst HVZ-UNI-II Instructions D'emploi

Masquer les pouces Voir aussi pour HVZ-UNI-II:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

General
3.2

Stone formations

1.) The stone formations 1 – 20 shown
below are suitable among others for
mechanical installation. Other stone
formations can also be laid by machines
as long as the stones are packed in the
correct formation ready for the
machine to lay them.
2.) The stone formations 16 – 20 are
suitable for mechanical installation by
the shifting adapter PA (4140.0003).
3.) The stone formations 21 – 25 are
suitable for mechanical installation by
special adapter.
Special adapters SA for installation units 21–24 or similar are available on request (indicate stone formation).
Accessoires set:
A
Tubular box spanner for adjusting the side clamping
(7063.0001)
B
Allen key No. 08 to shift the position adapter rail (7063.0001)
C
Feather steel lamellas to extend the gripper length at the
main clamping (34010100)
D
Feather steel lamellas to reduce the gripper length at the
main clamping (34010016)
11 / 41

Publicité

Table des Matières
loading

Table des Matières