Safety Instructions; General Notes; Intended Use; Initial Inspection - Minebea Intec Novego Manuel D'installation

Masquer les pouces Voir aussi pour Novego:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2 Safety instructions

2
Safety instructions
2.1

General notes

2.2

Intended use

2.3

Initial inspection

2.4

Before operational startup

EN-5
NOTICE
Warning of damage to property and/or the environment.
The product was in perfect condition with regard to safety features when it left the
factory.
To maintain this condition and to ensure safe operation, the user must follow the
instructions and observe the warnings in this manual.
The Hygienic Weighing Module Novego®, consisting of load cell PR 6261/.. and
pendulum base PR 6061/.., has been designed especially for weighing tasks using small
and medium-sized process vessels.
The weighing module Novego® may be used only for weighing tasks as intended.
The dimensions of all mounting and structural components must be calculated so that
suicient overload capacity is ensured for all loads which may occur while taking the
relevant standards into account. In particular, upright weighing objects (vessels or similar)
must be safeguarded against the weighing installation turning over or being shifted, thus
eliminating danger to people, animals, or goods even in the case of breakage of a
weighing module.
In intrinsically safe circuits, only load cells Novego®/..E may be used.
Installation and repair work must only be carried out by expert/qualiied personnel.
The weighing module relects the state of the art. The manufacturer does not accept any
liability for damage caused by third-party system components or due to incorrect use of
the product.
Check the contents of the consignment for completeness. Check the contents visually to
determine whether any damage has occurred during transport. If there are grounds for
rejection of the goods, a claim must be iled with the carrier immediately. The
Minebea Intec sales or service organization must also be notiied.
NOTICE
Perform visual inspection.
Before operational startup as well as after storage or transport, inspect the weighing
module (load cell with pendulum base) visually for signs of mechanical damage.
Hygienic Weighing Module Novego®
Minebea Intec

Publicité

Table des Matières
loading

Table des Matières