Minebea Intec Novego Manuel D'installation page 27

Masquer les pouces Voir aussi pour Novego:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5 Installation
EN-25
4. Check if all threaded holes required for mounting in the vessel foot/lug are provided.
5. Place gasket (6) into the corresponding groove of the load cell (7).
6. Screw adapter plate (5) onto the load cell using screws (4; 5x M6). It is essential to
observe the tightening torques of the screws (see Chapter 5.2).
7. Check that the gasket is positioned correctly (6).
8. As needed, loosen the screws, correct the position and tighten the screws again.
Hygienic Weighing Module Novego®
Minebea Intec

Publicité

Table des Matières
loading

Table des Matières