Hygienic Weighing Module Novego®
Minebea Intec
8. Carefully lower the weighing object (13) mounted on the weighing module onto the
substructure so that the threaded holes in the pendulum base can be aligned with the
holes in the substructure.
9. Insert the O-ring (20) into the groove of the pendulum base (3).
10. From below, screw the pendulum base (3) to the substructure (21) screws (22,
washer 4×; 23, screw 4× M8). Always comply with the strength classes and tightening
torques of the connector elements (see Chapter 5.2).
11. Remount the load cell cable into the junction box, see Chapter
manual relating to the junction box.
9 Servicing/repairs/cleaning
6.3
or the installation
EN-44