Installation; Prior To Mounting; Preparing The Substructure - Minebea Intec Novego Manuel D'installation

Masquer les pouces Voir aussi pour Novego:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5 Installation

5
Installation
5.1

Prior to mounting

5.1.1

Preparing the substructure

EN-17
The substructure must be designed as follows for the pendulum base:
-
horizontal (spirit level!) supporting/sealing surface
Note:
A pendulum base with tilt correction compensates for any inclination of ≤3°.
-
lat supporting/sealing surface
-
suicient load carrying capacity for the provided loads
Hygienic Weighing Module Novego®
Minebea Intec

Publicité

Table des Matières
loading

Table des Matières