Vent Shield Installation - Napoleon Luxuria Serie Manuel D'installation

Masquer les pouces Voir aussi pour Luxuria Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

venting installation
EN
6.7

vent shield installation

important:
For ease of installation, the front frame can be removed. The front frame must be
reinstalled prior to installing the nailing tabs.
note:
The vent shield is telescopic and must be adjusted to shield the first 30" of vertical vent always used.
1. Loosen the fasteners on the vent shield assembly. DO NOT DISCARD FASTENERS (Figure 1).
2. Adjust vent shield to its maximum vertical (Figure 2).
3. Tighten the fasteners to lock the vent shield height (Figure 3).
4. Remove the fasteners as shown (Figure 4). DO NOT DISCARD FASTENERS
5. Align the vent shield with the holes and replace above screws (Figure 5).
6. Secure the vent shield with two fasteners (supplied) to the front upper frame (Figure 6).
FOR SEE-THRU APPLIANCES, REPEAT STEPS WITH THE OPPOSITE SIDE (2 vent shields required)
42
W415-1710 / B / 08.17.18
Fig. 1
Fig. 4
Fig. 2
# 1 (x2)
Fig. 5
SEE-THRU EXAMPLE
Fig. 3
Front of
appliance
Fig. 6

Publicité

Chapitres

Table des Matières
loading

Table des Matières