Napoleon Luxuria Serie Manuel D'installation page 55

Masquer les pouces Voir aussi pour Luxuria Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

see-thru built out
N
O
Insulation
minimum framing
Ref
LVX38
E***
16 3/16" (41.1cm)
14 1/4" (36.2m)
N* / **
O*
25 11/16 (65.2cm)
4" (10.1cm) Max
P*
* Thickness of finishing material must be considered when constructing the framing for the protrusion (i.e. Dimen-
sions such as N, O, & P includes framing and finish material). If desired, side and bottom protrusions are also
permitted with 4" (10.1cm) Max. (finishing material not illustrated)
** This is a recommended dimension when mounting electronics above the appliance. Otherwise, it can be as
minimal as construction permits.
***Max. 21" (53.5cm).
note:
When finished, protrusions must never encroach inside the appliance finishing flange as this will impede
the fitment of the barrier and safe operation. See "finishing" section in the installation manual.
note:
The LVX series requires a minimum enclosure height, as illustrated (dimension L), measured from the bottom of the
appliance. For temperature requirements, this area must be left unobstructed. Some venting configurations that re-
quire more vertical rise will require a larger enclosure to provide minimum vertical clearance between vent pipes and
combustibles.
finish framing - after appliance installation
Drywall
E
LVX50
16 3/16" (41.1cm)
14 1/4" (36.2m)
25 11/16 (65.2cm)
4" (10.1cm) Max
note:
P
Finish framing must be built
after appliance has been
placed in its final position and
venting connected.
Option 2 illustrated (appliance
not shown)
LVX62
16 3/16" (41.1cm)
16 3/16" (41.1cm)
14 1/4" (36.2m)
14 1/4" (36.2m)
25 11/16 (65.2cm)
25 11/16 (65.2cm)
4" (10.1cm) Max
4" (10.1cm) Max
W415-1710 / B / 08.17.18
EN
LVX74
55

Publicité

Chapitres

Table des Matières
loading

Table des Matières