Vent Shield Installation - Napoleon Vector Série Manuel D'installation

Masquer les pouces Voir aussi pour Vector Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.6

vent shield installation

important:
For ease of installation, the front frame can be removed. The front frame must be
reinstalled prior to installing the nailing tabs.
note:
The vent shield is telescopic and must be adjusted to shield the fi rst 30" of vertical vent always used.
1. Unscrew the fasteners on the vent shield assembly. DO NOT DISCARD FASTENERS (Figure 1).
2. Adjust the vent shield to its maximum vertical (Figure 2).
3. Use the fasteners in step 1 to hold the new vent shield height (Figure 3).
4. Unscrew the fasteners as shown (Figure 4). DO NOT DISCARD FASTENERS
5. Use the fasteners in step 4 to secure the vent shield to the appliance (Figure 5).
6. Secure the vent shield with two fasteners (supplied) to the front upper frame (Figure 6).
FOR SEE-THRU APPLIANCES, REPEAT STEPS WITH THE OPPOSITE SIDE (2 vent shields required).
Fig. 1
Fig. 4
venting installation
Fig. 2
Type 1 (x2)
Fig. 5
SEE-THRU EXAMPLE
EN
Front of
appliance
35
W415-1709 / D / 06.14.19

Publicité

Chapitres

Table des Matières
loading

Table des Matières