Installation Overview - Napoleon Luxuria Serie Manuel D'installation

Masquer les pouces Voir aussi pour Luxuria Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

general information
EN
1.2

installation overview

2
6
13
5
3
14
9
8
4
10
Recommended installation steps:
1. Determine venting requirements before deciding the final location of the appliance
2. Plan out appliance enclosure, framing, fronts, accessories, etc.
3. Install rough framing (refer to "rough framing" section)
4. Place the appliance in its final position
5. Install nailing tabs (refer to "nailing tab installation" section)
6. Install appliance venting (refer to "venting installation" section)
7. Install vent shield (refer to "vent shield installation" section)
8. Install all electrical wirings (refer to "electrical information" section)
9. Install gas lines (refer to "gas installation" section)
10. Fit glass guard (refer to "glass guard assembly installation / removal" section)
11. Test appliance (Glass Guard must be installed while testing the appliance)
12. Remove and protect glass guard. Take great care to store using original packaging.
13. Complete framing (refer to "finish framing" section)
14. Finishing (refer to "finishing" section)
15. If necessary, do final adjustments to glass guard.
16. Complete installation checklist in the owner's manual and apply the serial number to owner's manual
7
W415-1710 / B / 08.17.18

Publicité

Chapitres

Table des Matières
loading

Table des Matières