Report prepared for Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on
6/8/2020 7:48:41 AM
MANUAL INSTALLATION AND OPERATION WFP-75 8411 ENGLISH
OF 40)
9.3.3
Offset Installation
To insure a good draft, it is recommended to have a length of 18" (457 mm) from the top of
the unit to the first offset (A). However, starting using a 30° or 45° (Canada only) elbow is also
approved.
9.3.4
Masonry Chimney Installation
The masonry chimney must meet the minimum requirements of the local building code or equivalent
for a safe installation. Contact a building inspector to learn about the requirements in the area.
Before starting the installation, the masonry chimney should be inspected for cracks, crumbling
mortar, creosote layers, obstructions or other signs of deterioration. If signs of deterioration are
noted, the chimney should be repaired and cleaned before installation.
WFP-75 8411
Stove Builder International Inc. | 46345 | Rev: Apr 13 2020 12:33PM | Uncontrolled Copy
8.
9.
10. Install the appropriate number of chimney sections to
B
A
11. Install another elbow to bring the chimney back in a
12. Continue the installation following the instructions of
Table 2 : Minimum system height when using elbows
Chimney model
Vertical Installation
Two (2) elbows
Four (4) elbows
Follow the instructions for a ceiling supported
installation until the first elbow.
Install and turn the elbow in the right direction. Attach
to the chimney using three ½"(12 mm) metal screws.
obtain the necessary deviation. Secure the chimney
sections together with three ½" (12 mm) screws. If
the offset section has two or more chimney sections,
a bracket must be installed. If the chimney go through
a wall, install a wall thimble.
vertical position.
the ceiling supported installation.
See table XX
15 ft (4,6 m)
15 ft(4,6 m)
17 ft (5,2 m)
(29
Page 29
Page 718 of 971