103704002MTL-001 TEST REPORT REV 4
TEST REPORT FOR STOVE BUILDER INTERNATIONAL INC.
Report No.: 103704002MTL-001
Date: 11/16/18
Following assembly, the unit was placed on the test stand. Prior to beginning the emissions
tests, the manufacturer operated the unit for a minimum of 50 hours at medium burn rates to
break-in the stove. The unit was found to be operating satisfactory during this break-in. The 50
plus hours of pre-burning were conducted from October 17
used for the break-in process was beech cordwood.
Following the pre-burn break-in process the unit was allowed to cool and ash and residue were
removed from the firebox. The unit's chimney system and laboratory dilution tunnels were
cleaned using standard wire brush chimney cleaning equipment. On October 31
was set-up for testing.
SECTION 5
EQUIPMENT
Handheld Thermocouple
Thermometer
Floor scale
DGM system 1
DGM System 2
Thermometer calibrator
Reference DGM
5 kg weight
Temperature acquisition
Pitot tube type S
Analytical scale
Table scale
100 mg weight
10 g weight
Anemometer
Magnesense
Magnesense
DGM system 3
Pressure transmitter
Version: 05/10/17
Stove Builder International Inc. | 46345 | Rev: Apr 13 2020 12:33PM | Uncontrolled Copy
INV
Equipment
Number
SBI-004
SBI-014
SBI-046
SBI-047
SBI-096
SBI-103
SBI-190
SBI-197
SBI-104
SBI-206
SBI-222
SBI-237
SBI-238
SBI-097
SBI-249
SBI-250
SBI-276
SBI-293
(4 OF 21)
th
to October 30
Calibration Due
MU
April 19, 2019
±0.5
March 31, 2019
± 0.022 kg
April 10, 2019
±2% F.S.
April 10, 2019
±2% F.S.
April 05, 2019
±0.5
October 26, 2019
±2% F.S.
October 02, 2023
±0.2 g
October 26, 2019
±0.5
June 26, 2019
±0.58
April 30, 2019
±0.000088 g
March 31, 2019
±0.58 g
October 09, 2023
±0.0025 mg
October 09, 2023
±0.012 mg
June 26, 2019
±15 ft/min
February 05, 2019
±0.00015" H2O
February 06, 2019
±0.00015" H2O
April 09, 2019
±2% F.S.
June 26, 2019
±9.4e-003 psi
Page 4 of 21
1829, 32nd Avenue
Lachine, Que,H8T 3J1
Telephone: 514-631-3100
Facsimile: 514-631-1133
www.intertek.com/building
th
2018. The fuel
st
2018, the unit
o
F
o
F
o
F
GFT-OP-10c
Page 780 of 971