Minimum Clearances - Stiebel Eltron SBP 200 E Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 22
INSTALLATION
Installation

8.1.1 Minimum clearances

SBP 200-400 E
The minimum side clearances specified enable accessories to be
installed.
The minimum side clearances can be swapped between left and
right.
≥100
≥800
SBP 700 E | SBP 700 E SOL
≥100
f Maintain the minimum clearances.
f
www.stiebel-eltron.com
≥800
≥100
≥100
8.2
Releasing the transport lock
6
5
1 Nut
2 Washer
3 Threaded pin
4 Shipping pallet
5 Adjustable feet (SBP 200-400 E)
6 Thermal insulation
f Remove the packaging material from the cylinder. The corru-
f
gated card board serves as padding for the following steps.
f Tilt the appliance together with the shipping pallet onto its
f
side and place it on the corrugated card board or another
suitable underlay.
f Undo and remove the nut and washer on the underside of
f
the shipping pallet.
f Pull the shipping pallet away from the appliance. Lay the ap-
f
pliance down carefully on the padding while doing so.
f Undo and remove the threaded pin on the underside of the
f
appliance.
f Press the supplied plug into the now exposed aperture in the
f
thermal insulation.
SBP 200-400 E
This appliance comes with adjustable feet as standard.
f Wind the adjustable feet out far enough so they protrude be-
f
yond the thermal insulation.
f Stand the appliance upright.
f
SBP 200-700 E | SBP 700 E SOL |
3
2
1
4
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sbp 400 eSbp 700 eSbp 700 e sol

Table des Matières