DAB E.SYBOX MINI 3 Instructions Pour L'installation Et L'entretien page 43

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 72
instructions manual, if due to misprints or errors in copying. The Manu-
facturer reserves the right to make any modifications to products that it
may consider necessary or useful, without affecting their essential char-
acteristics.
1- GENERAL
The product is an integrated system composed mainly of a self-priming multi-stage cen-
trifugal electropump, an electronic circuit that controls it and an expansion vessel. Cooling
of the motor with water rather than air ensures less noise in the system and the possibility
of locating it even in recesses without ventilation.
Applications
Water systems supply and pressure boosting domestic use or industrial use. On the out-
side the product appears as a parallelepiped that presents 6 faces as shown in Fig.1.
C
E
B
A
F
Figure 1
Face A: a door allows access to the Technical Compartment.
Inside the technical compartment you can access (see Fig.3):
1. Rapid Guide;
2. Technical data plate;
3. Filling cap (only for vertical
configuration);
1
3
4. Accessory tool;
6
5. Motor shaft;
6. QR-code
2
5
4
Face B: A rubber cable gland allows the exit of the power cable to be connected to the
power mains.
Face C: the 4 brass threads form the seat for the 4 support feet in the case of vertical
installation. The two 1" screw caps can be removed to make the connections towards the
system, depending on the installation configuration you want to adopt. If applicable, con-
nect to the connection marked "IN" the system from which you want to draw water (well,
cistern,...) and connect the delivery system to the connection marked "OUT". There is also
a ventilation grid. The 3/8" cap allows drainage of the system in the case of horizontal instal-
lation. There is also a ventilation grid.
Face E: the 4 brass threads form the seat for the 4 support feet in the case of horizontal
installation. The main function of the 1" cap is drainage of the system in the case of vertical
installation. There are also 2 ventilation grids.
Face F: as indicated by the label to be removed, the 1" cap next to the word "IN" on face C
Figure 2
Figure 3
GB
ENGLISH
40

Publicité

Table des Matières
loading

Table des Matières