Assembly And Installation - Yamaha YZ250/LC Manuel Du Propriétaire

Table des Matières

Publicité

RADIATOR
EC455000

ASSEMBLY AND INSTALLATION

EC445353
Radiator
1. Install:
9
Radiator breather hose 1
9
Radiator hose 2 2
To radiator (right) 3.
2. Install:
9
Radiator (right) 1
9
Bolt [radiator (right)] 2
9
Radiator hose 4 3
Refer to "CABLE ROUTING DIAGRAM"
section in the CHAPTER 2.
3. Install:
9
Radiator (left) 1
9
Bolt [radiator (left)] 2
9
Radiator hose 1 3
Refer to "CABLE ROUTING DIAGRAM"
section in the CHAPTER 2.
4. Tighten:
9
Clamp (radiator hose 2) 4
5. Install:
9
Panel 1
9
Bolt (panel) 2
NOTE:
Fit the hook a on the inner side first into the
radiator.
4-6
ENG
1 Nm (0.1 m•kg, 0.7 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
1 Nm (0.1 m•kg, 0.7 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
1 Nm (0.1 m•kg, 0.7 ft•lb)
1 Nm (0.1 m•kg, 0.7 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)

Publicité

Table des Matières
loading

Table des Matières