Log Shipping Bracket; Decorative Brick Panel Installation - Napoleon Park Avenue GD82NT-PAE Manuel D'installation Et D'opération

Masquer les pouces Voir aussi pour Park Avenue GD82NT-PAE:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6.3

log shipping bracket

Before installing the logs, you must first remove the log shipping brackets. Lift up to
remove.
6.4

decorative brick panel installation

Decorative panels may discolor after time.
Carefully remove the glass door and all logs see "FINISHING"
A.
section.
Remove the two screws holding the front portion of the rear
B.
air deflector. Remove the pilot shield by removing the two
screws as illustrated.
Remove the 3 screws securing the burner down and carefully
C.
remove the burner. Do not remove the screws and washers
securing the fibre burner cover.
Install the right brick panel by sliding the bottom edge of the
D.
panel down the right firebox side then pivot the top edge of
the panel into place against the firebox wall. Hold in place
with the brick retainers.
Rest the bottom edge of the rear panel on top of the rear
E.
portion of the air deflector at the back of the firebox and push
into place. The rear panel is held in place when both side
panels are in position.
Install the left brick panel using the same method described in
F.
step 4.
Replace the burner, air deflector, logs and
G.
glass door.
note:
Due to the brittle material of the bricks, care must
be taken not to bend or force them into place.
Refractory panels require a 24-hour curing period
on a low flame.
finishing
LOG SHIPPING
BRACKET
STEP
B
STEP
C
E
D
HERRINGBONE PATTERN ILLUSTRATED
W415-2358 / B / 05.17.22
EN
PILOT SHIELD
F
35

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Park avenue gd82pt-pae

Table des Matières