Design Information; Product Dimensions And Clearances; Installation Options - Monogram ZV900 Instructions D'installation

Masquer les pouces Voir aussi pour ZV900:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CONTENTS

Design Information

Product Dimensions and Clearances ............................ 3

Installation Options ........................................................ 3

Installation Preparation
Advance Planning, Ductwork, Framing ......................... 4
Power Supply ................................................................ 4
Duct Fittings .................................................................. 5
Tools and Materials Required ....................................... 6
Remove the Packaging ................................................. 6
Determine Installation Height ........................................ 7
Wall Mount Installation Heights ..................................... 7
Check Installation Hardware ......................................... 8
Installation—Vented to the Outside
Ductwork, Wiring Locations ........................................... 9
Step 1, Install Framing for Hood Support...................... 9
Step 2, Install Mounting Bracket ................................. 10
Step 3, Install Duct Bracket ......................................... 10
Step 4, Prepare the Hood ........................................... 11
Step 5, Mount the Hood .............................................. 12
PRODUCT DIMENSIONS AND
CLEARANCES
*Height
*Height
to
to
Ceiling
Ceiling
21 7/ 16 "
20 7/16"
* The Supplied Duct Cover Fits 8' to 9'-5" Ceiling Heights.
For 9'-6" to 10'-5" ceilings, order ZX90010.
The vent hood must be installed 24" min., and 30≤
max. above the cooking surface. The hood installation
height above the cooking surface depends upon
ceiling height.
The telescopic duct cover conceals the ductwork
running from the top of the hood to the ceiling. The
supplied duct cover is sized to reach 8' to 9'-5" ceiling
heights.
The ZX90010 accessory is available for ceiling
heights of 9'-6" to 10'-5".
1" = 2.5 cm; 1' = 0.3 m
49-80328 Rev. 4
Design Information
3 1/4"
3 1/4 "
35 7/8"
Step 6, Level the Hood................................................ 12
Step 7, Connect Ductwork .......................................... 12
Step 8, Connect Electrical ........................................... 13
Step 9, Install Duct Covers.......................................... 14
Step 10, Install Filters .................................................. 14
Step 11, Finalize Installation ....................................... 14
Installation—Recirculating
Ductwork, Wiring Locations ......................................... 15
Step 1, Install Framing for Hood Support.................... 15
Step 2, Install Mounting Bracket ................................. 16
Step 3, Install Duct Bracket ......................................... 16
Step 4, Prepare the Hood ........................................... 17
Step 5, Mount the Hood .............................................. 17
Step 6, Level the Hood................................................ 17
Step 7, Size and Cut Duct Piece................................. 18
Step 8, Connect Electrical ........................................... 18
Step 9, Install Duct Covers.......................................... 19
Step 10, Install Filters .................................................. 19
Step 11, Finalize Installation ....................................... 19
INSTALLATION OPTIONS
NOTE: Installation height should be measured from
the cooking surface to the outer glass sides.
This hood may be installed onto a wall and vented
to the outdoors, or it can be installed for recirculating
operation. All necessary parts for recirculating
operation are supplied with th e hood. No kits required.
This hood can be installed over any Monogram
electric cooktop or gas cooktop. It cannot be
installed over a Monogram Professional cooktop
or range.
24" Min.
30" Max.
3

Publicité

Table des Matières
loading

Table des Matières