Table Des Matières; Design Information; Models Available; Product Dimensions And Clearances - Monogram ZV850 Instructions D'installation

Masquer les pouces Voir aussi pour ZV850:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CONTENTS
Models Available ................................................................................ 3
Product Dimensions ......................................................................... 3
Ductwork Planning .......................................................................... 4
Ceiling Framing for Adequate Support .................................. 4
Duct Fittings ......................................................................................... 5
Power Supply ....................................................................................... 6
Tools and Materials Required ...................................................... 6
Remove the Packaging ................................................................. 7
Check Installation Hardware ...................................................... 7
Determine Installation Height ..................................................... 8
Install Ceiling Support Structure .........................................9-11
Installation - Vented to the Outside ...............................12-16
Step 1, Mount Template ...............................................................12
Step 2, Install Upper Support Frame ......................................12

MODELS AVAILABLE

Model ZV850
Model ZV855
These hoods may be installed to vent to the outdoors,
or they may be installed for recirculating operation.
All necessary parts for recirculating operation are
supplied with the hood. No kits required.

PRODUCT DIMENSIONS AND CLEARANCES

The vent hood must be installed 24" minimum and
30
maximum above the cooking surface.
"
NOTE: Installation height should be measured from
the cooking surface to the lowest part of the hood.
30" Maximum

Design Information

......................................12
" or 36"
24" Minimum
36" Minimum
Step 4, Secure Wiring ....................................................................13
Step 5, Size and Install Ductwork ............................................13
Step 6, Install Decorative Duct Covers ..................................14
Step 7, Install Hood ........................................................................15
Step 8, Connect Electrical ............................................................15
Step 9, Slide Duct Cover
Down, Install Side Utensil Rods ................................................15
Step 10, Install Filters.....................................................................16
Step 11, Finalize Installation.......................................................16
Installation - Recirculating .................................................17-21
Step 1, Mount Template ...............................................................17
Step 2, Install Upper Support Frame ......................................17
Step 4, Secure Wiring ....................................................................18
Step 5, Size and Install Ductwork ............................................18
Step 6, Install Decorative Duct Covers ..................................19
Step 7, Install Hood ........................................................................20
Step 8, Connect Electrical ............................................................20
Down, Install Side Utensil Rods ................................................20
Step 10, Install Filters.....................................................................21
Step 11, Finalize Installation.......................................................21
Monogram electric or gas cooktop except Monogram
Professional cooktops or ranges larger than 30".
operation.
running from the top of the hood to the ceiling.
over 8 feet. See the table on page 8.
35-3/8 (excluding utensil rods)
36-1/2 (including utensil rods)
This accessory is available for installation with ceiling
heights of 8 7" to over 10 feet. See the table on page 8.
The duct cover accessory must be on-site with the
hood at the time of installation.
3
......................................18
*Height
to Ceiling
8-1/4"
27-1/2"

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Zv855

Table des Matières