Connect Ductwork - Monogram ZV900 Instructions D'installation

Masquer les pouces Voir aussi pour ZV900:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION—VENTED TO THE OUTSIDE
5
MOUNT THE HOOD
WARNING
2 people are required to lift and
position the hood onto the mounting bracket.
■ L ift the hood onto the mounting bracket.
■ P osition a spirit level at the bottom of the hood to
check side to side leveling.
6
LEVEL THE HOOD
This hood has built-in levelers on the mounting hooks
at each side. Use a long Phillips screwdriver from the
front to access the levelers.
Levelers
■ U se the top screw hole in the leveler to raise or
lower the hood on that side.
■ U se the bottom screw hole to pull the hood tight
against the wall surface.
Screw hole
■ M ark hole location at the bottom of the hood.
■ R emove the hood. If the bottom screw hole does
not enter a stud, enlarge the hole to 3/8" and install
wall fastener anchors.
■ P lace the hood back onto the mounting bracket,
check level again and install the wall fastener.
12
Installation Instructions
7

CONNECT DUCTWORK

■ I nstall ductwork, making connections in the direction
of airflow as illustrated.
■ P ush duct over the exhaust outlet and damper.
■ S ecure joints in ductwork with sheetmetal screws.
■ W rap all duct joints and the flange connections with
duct tape for an airtight seal.
Duct tape
over seam
and screw
CAUTION
Do not use sheet metal screws at the
hood flange connection. Doing so will prevent proper
damper operation. Seal connection with tape only.
Airflow
Screw
1" = 2.5 cm; 1' = 0.3 m
49-80328 Rev. 4

Publicité

Table des Matières
loading

Table des Matières