Install Mounting Bracket - Monogram ZV900 Instructions D'installation

Masquer les pouces Voir aussi pour ZV900:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION—VENTED TO THE OUTSIDE
2

INSTALL MOUNTING BRACKET

This vent hood must be secured to the horizontal
support or wall studs.
■ W ith the template taped in place, use a punch to
mark mounting bracket screw locations.
■ D rill 3/16" pilot holes in 2 of the punched locations
in the lower bracket.
Drill 2 (two) 3/16≤ pilot holes through studs or rear wall support
49-80405 04-06 JR
■ R emove the template.
■ U se wood screws to secure the mounting bracket to
the wall. The screws must engage wall studs or the
installed horizontal mounting support.
■ C heck to be sure that the bracket is level.
10
Installation Instructions
14-5/8≤
to top of
bracket
C
L
REAR WALL
MOUNTING TEMPLA TE
ALIGN BOTT OM EDGE
WITH PENCIL LINE,
INDICA TING BOTT OM
OF THE HOOD
t
3
INSTALL DUCT BRACKET
The duct bracket should be installed against the back
wall and flush with the ceiling. This bracket will hold
the duct cover in place at the top.
Secure the bracket to the wall:
■ A lign the marked centerline on the bracket with the
centerline on the wall.
■ M ark 2 screw hole locations in the wall.
■ D rill 3/16" pilot holes in the marked locations.
■ I f pilot holes do not enter studs, enlarge the holes
to 3/8" and install wall fastener anchors.
■ D rive screws, by hand, into the fasteners to allow
anchors to expand. Remove the screws.
■ S ecure the bracket to the wall with wood screws
and/or fasteners.
1" = 2.5 cm; 1' = 0.3 m
49-80328 Rev. 4

Publicité

Table des Matières
loading

Table des Matières