Installation Instructions - Monogram ZV900 Instructions D'installation

Masquer les pouces Voir aussi pour ZV900:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION—VENTED TO THE OUTSIDE
DUCTWORK, WIRING LOCATIONS
Determine the exact location of the vent hood.
■ L ocate the template packed with the literature.
– M easure 36" from the floor to the top of the
cooking surface. Add hood installation height
determined on page 7. Mark that location.
– U se a level to draw a straight pencil line on the wall.
5-1/2" c enterline to wall
8-1/2" dia. hole
FOR WALL VENT DUCT
– T ape the template in position along the
penciled line. CHECK TO BE SURE THE
TEMPLATE IS LEVEL.
Ceiling ducting:
If ductwork will vent straight up to the ceiling:
■ U se a level to draw a line straight up, from the
centerline on the template to the ceiling.
■ M easure 5-1/2" from the back wall to the centerline
of an 8-1/2" hole on the ceiling.
NOTE: If drywall is not present, add drywall thickness
to the 5-1/2" dimension.
Wall Ducting:
If ductwork will vent to the rear:
■ U se a level to draw a line straight up from the
centerline on the template.
■ M easure at least 26" above the pencil line that
indicates the bottom installation height, to the
centerline of an 8-1/2" dia. duct hole. (Hole may be
elongated for duct elbow.)
HOUSE WIRING LOCATION:
■ T he junction box is located on the top left side of
the hood.
■ W iring should enter the back wall at least 22" above
the bottom of the hood, and within 6" of the left side
of the centerline.
1" = 2.5 cm; 1' = 0.3 m
49-80328 Rev. 4

Installation Instructions

FOR CEILING VENT DUCTING
Ceiling
Centerline 26" above the
marked bottom pencil line
for installation height.
1
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT —
Framing must be capable of
supporting 100 lbs.
8-1/2" min. opening for ductwork
Centerline of
installation
space
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
■ C ut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
■ I nstall a horizontal support at least 1" x 6" between
two wall studs at the bottom mounting bracket
installation location. The horizontal support must
be flush with the room side of the studs. Use cleats
behind both sides of the support to secure to wall
studs.
■ R einstall drywall.
View from
rear cleats
1" x 6" min.
mounting
support
9

Publicité

Table des Matières
loading

Table des Matières