Installation-Recirculating - Monogram ZV900 Instructions D'installation

Masquer les pouces Voir aussi pour ZV900:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION—RECIRCULATING
DUCTWORK, WIRING LOCATIONS
Determine the exact location of the vent hood.
■ L ocate the template packed with the literature.
■ M easure 36" from the floor to the top of the cooking
surface. Add hood installation height determined on
page 7. Mark that location.
■ U se a level to draw a straight pencil line on the wall.
■ T ape the template in position along the penciled
line. CHECK TO BE SURE THE TEMPLATE IS
LEVEL.
■ U se a level to draw a line straight up, from the
centerline on the template to the ceiling.
HOUSE WIRING LOCATION:
■ T he junction box is located on the top left side of
the hood.
■ W iring should enter the back wall at least 22"
above the bottom of the hood, and within 6" of the
centerline.
1" = 2.5 cm; 1' = 0.3 m
49-80328 Rev. 4
Installation Instructions
Ceiling
1
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT —
Framing must be capable of
supporting 100 lbs.
Centerline of
installation
space
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
■ C ut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
■ I nstall a horizontal support at least 1" x 6" between
two wall studs at the bottom mounting bracket
installation location. The horizontal support must
be flush with the room side of the studs. Use cleats
behind both sides of the support to secure to wall
studs.
■ R einstall drywall.
View from
rear cleats
1" x 6" min.
mounting
support
15

Publicité

Table des Matières
loading

Table des Matières