Mounting Instructions; Mounting Positions - Pfaff BETA BGV C1 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Electric wire rope winch >BETA II< BGV C1
English
for stages and studios
3.

Mounting Instructions

3.1 Mounting:
NOTE:
After having removed the transport blocks the winch may tilt to the
motor side. Therefore the winch has to be secured against tilting
before mounting.
Pay attention to crane suspension points!
The mounting structure must be designed to sustain the max. forces im-
posed by the winch (impact coefficient acc. to DIN15018 has to be con-
sidered)
The mounting structure must be dimensioned for double operating load.
Pay careful attention that the mounting surface is flat and true.
Only fix the winch by means of good quality screws.
Tighten the screws evenly.
Secure the screws.
Pay attention to unhindered rope coiling!
3.2 Mechanical fixing:
Size
screws
material grade
number of screws
tightening torque [Nm]

3.3 Mounting positions

The wire rope winches may be mounted in different positions.
Fix the ventilation screw, the oil drain screw and the oil level screw (oil sight glass) acc. to following
drawings. Pay attention to oil quantity! (see table)
H - 01
H - 03
Ventilation screw
main gear
Oil level screw
Oil sight glass (if existing)
technische Änderungen vorbehalten
P 1
P 2
M 12
M 16
4
70
170
Some winches are actuated by a flat gear with a preceding spur
wheel back-geared motor. The preceding spur gear wheel has to be
mounted as shown when changing the mounting position.
FZ = 2-stage gear units
FD = 3-stage gear units
Oil drain screw
design changes under reserve
04.01.411
P 3
P 3.5
M 20
M 20
min. 8.8
4
4
340
340
H - 02
H - 04
changements techniques sous réserve
crane suspention points
transport blocks
P 4
P 5
M 24
M 30
4
4
590
1200
Ventilation screw
Oil level screw
Oil drain screw
Seite / page 26
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Beta ii bgv c1

Table des Matières