Installation; Installation Guidelines - Burkert 8205 Notice D'utilisation

Masquer les pouces Voir aussi pour 8205:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3 INSTALLATION

3.1 Installation Guidelines

Calibrate the controller before
installation (see § 4.2).
Before first electrode
calibration, immerse it for 2
hours at least in buffer solution
pH=7 or in a solution of KCl 3M
(223,6 g/l) or in drinkwater.
Pressure-Temperature-Diagram
Mind pressure-temperature dependence
according to the respective fitting
materials.
P (bar)
Application range
10
9
8
7
PVDF
6
PVC + PP
5
4
3
PVC (PN 6)
2
1
0
-30
-50
-10
+10
+30
Installation Guidelines
Mount the compact pH controller in vertical
position (max. ±75°) into a horizontal pipe
(cf fig. 3.1).
75°
The device must be protected
from the rain, constant heat
radiation and other
environmental influences such
as magnetic fields or direct
exposure to sunlight.
PVDF (PN 6)
PP (PN 6)
+50
+70
+90
+110
+130
T (°C)
75°
PH CONTROLLER 8205
The electrode must continuously be
immersed into the measured fluid in order
to protect it from drying out.
3.1.1 installation compact 8205
The pH controller can be easily installed in
pipes using our specially designed fitting
system. Before installation, the controller
must be calibrated with buffer solutions
(see § 4.2). Remove protective cap of the
sensor.
1. The fitting
pipe according to the installation
specifications in section 3.1.
2. Insert plastic nut
plastic ring
3. Carefully insert the pH controller
the fitting. If installed properly, the
controller cannot be rotated.
4. Tighten controller housing to fitting with
plastic nut
Plastic nut must only be
tightened by hand!
Mounting, compact version
Fig. 3.1
E-9-
must be installed into the
into fitting, and let
snap into guide bush
.
.
into

Publicité

Table des Matières
loading

Table des Matières