Dhollandia DH-SM.20 Instructions De Montage page 45

Masquer les pouces Voir aussi pour DH-SM.20:
Table des Matières

Publicité

EN
M
SIDE-mounting + option S255: fit the platform buffers
S255 now, together with the mounting brackets of the
sliding tubes to the chassis of the vehicle. This will avoid
double work at a later stage [See Fig. 5.22].
For all HTL ≥ 2500 kg, reinforce the bolted con-
nections by means of 10mm weld to the vehicle
sub frame (truck chassis), or to the bottom
flange of the I-beam (trailer chassis) [See Fig.
5.23].
Consult the FITTING AND BODY BUILDING
INSTRUCTIONS of the vehicle manufacturer to
verify what is allowed.
F
M
The torque fastenings of all bolts should be
checked after completion of the compulsory
static and dynamic weight tests at the end of
the fitting process, and retightened if required.
Ensure that all freshly made chassis perfora-
tions are properly deburred, and that all metal
work (cutting, drilling, welding, grinding...) is
properly treated with an anti-corrosive protec-
tion (e.g. Zinc-spray or Dinitrol). Allow to dry.
Consult the FITTING AND BODY BUILDING
INSTRUCTIONS of the vehicle manufacturer
to take into account their instructions.
DHOLLANDIA
5.22
!
5.23
45
!

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dh-smr.20Dh-ssu.30Dh-ssur.30

Table des Matières