Instructions for FPT test
40 |
Warranty, maintenance and checks
Important: Patient must not be connected! Thopaz must be
disconnected from the mains (battery operation) and turned off.
1. Connect the tubing (079.0021) and the 0.8l (079.0016)
canister to Thopaz according to chapter 8.
2. Connect vacuum gauge with tube to the patient connector.
3.
Press simultaneously
(Tube e.g. ø 12 x 7 mm, not inclu-
ded in the scope of delivery)
3.1 Press and hold [
simultaneously, then...
3.2 Press additionally [
start safety test.
3.3 Follow the instructions
on the display.
0.8 l
], [
]
] to