6.4
EasyClean free Mix version
Carry out disposal
Partial emptying
Connect the suction hose of the disposal vehicle to the
Storz-B coupling.
Start the pumping process at the disposal vehicle.
Switching the shredder-mix pump on
Wait until 1/3 of the static level has been pumped off.
Duration depends on the nominal size.
Pause the pumping process at the disposal vehicle.
Switch the shredder-mix pump on.
Rinse
Wait until the separator contents have been homogenised
sufficiently. The factory setting of the control unit is
adapted to the nominal size. The parameters can be
taken from the installation and operating instructions
016-271 Connect 400 V Mono control unit for grease sep-
arators.
The shredder-mix pump stops automatically after the
time has elapsed. If necessary, the shredder-mix pump
can also be deactivated manually before the set time has
elapsed.
Start the pumping process at the disposal vehicle
again.
016-673
Installation and operating instructions
69 / 132