Télécharger Imprimer la page

Pit Boss PLATINUM KC COMBO Manuel D'instructions page 11

Publicité

Les langues disponibles

Les langues disponibles

7. RELEASING REGULATOR AND LIGHTING ROD
Parts Required:
Main Barrel / Hopper Assembly (#9)
1
x
Installation:
Take the Main Barrel / Hopper Assembly out with foam on its sides.
Use the scissors to cut the cable tie which is under the Main Barrel / Hopper
Assembly to release the regulator and Lighting rod.
NOTE: Do not use knife to cut the cable tie because knife may damage
the regulator hose which may cause gas leaking.
8. SECURING THE GREASE TRAY BRACKETS
Parts Required:
1
x
Grease Tray Brackets (#34)
Installation:
Remove the four screws pre-installed on the Grease Tray Bracket. Open the
gas grill lid. Install the Grease Tray Bracket to the gas grill body by using the
pre-installed screws.
9. ASSEMBLING MAIN BARREL / HOPPER ASSEMBLY TO THE CART
Parts Required:
1
x
Main Barrel / Hopper Assembly (#9)
Installation:
Use a second person to lift the Main Barrel / Hopper Assembly then seat it
to the pre-assembled cart.
NOTE: The regulator needs to be put inside the cart and the lighting rod
keep outside of the cart, the hose of the regulator needs to go through
the hole in the Front-Right Leg.
10. SECURING MAIN BARREL / HOPPER ASSEMBLY TO THE CART
Parts Required:
Main Barrel / Hopper Assembly (#9)
1
x
Screw (#A)
16 x
Installation:
Mount the Main Barrel / Hopper Assembly to the pre-assembled cart.
7
9
8
34
9
10
11

Publicité

loading

Ce manuel est également adapté pour:

Pb1285kc1049910879