«Paral. Slv. Vt.Rsv» reserved voltage Slave of the par-
–
allel system. Equipment on normal operating (inverter
in operation), that the output switch (Q2) is turned
«On» in 2nd place or subsequently (after the «Paral.
Mst. Volt» or «Paral. Mst. Vt.Rsv»). Initially, it corre-
sponds to the equipment with the highest address,
excepting the one from «Voltage Master». In case of
failure of the Master, it will take its functions.
«Paral. Slv. Volt» voltage Slave of the parallel system
–
(systems with more than two equipments only). Equip-
ment on normal operating (inverter in operation), that
the output switch (Q2) is turned «On» in 2nd place or
subsequently (after the «Paral. Mst. Volt» or «Paral.
Mst. Vt.Rsv»). It will become as «reserved voltage
Slave», when it practise as «voltage Master». In sys-
tems with more than three equipments in parallel, the
hierarchy of «reserved voltage Slave» will be taken by
the one with the highest address among the «voltage
Slave».
Examples:
a)
UPS: Normal, Invert.
CFG: Mst. Volt
Screen 0.2: Internal firmware versions of both Digital Signal
•
Processor ("DSP Ver:") and microcontroller ("uC Ver:"). In the
sample screen, "ver. 3.2 a" and "ver. 2.4 b" respectively.
Screen 0.3: UPS Serial Number, expressed with 10 charac-
•
ters. Possible characters ranges are "0"-"9", "A"-"Z" and also "
" (blank space), "-". See sample screen.
CONTROL & STATUS
OF THE UNIT
screen 1.0
Fig. 50. Screen submenu 1.0. Start up / shutdown.
USER'S MANUAL
b)
UPS: Shutdown,Off
CFG: Mst. Byp
()
UPS ON STAND-BY
()
<ENT> TO START
screen 1.1
(ENT)
<ENT> TO CONFIRM
(ESC)
<ESC> TO CANCEL
screen 1.2
(ENT)
UPS RUNNING
<ESC> TO STOP
screen 1.3
(ESC)
<ENT> TO CONFIRM
(ESC)
<ESC> TO CANCEL
screen 1.4
(ENT)
7.3.2. ''CONTROL AND STATUS OF THE
EQUIPMENT" level see Fig. 50.
The operating described in this section corresponds
•
to equipments with alphanumerical panel only. For
those units with touch screen control panel, follow the
same steps and when it is needed any operating that in-
volve any action over it, interact according to EL064*01
document.
Screens 1.1, 1.3 and validation screen (1.2 / 1.4): to start
•
up and shutdown the equipment through the control panel.
To start up and shutdown the equipment, see sections 6.2 to 6.5.
•
Screen 1.5 and validation screen (1.2 / 1.4): to order a
•
battery test. On the second row, information about the battery
test is given. Possible messages:
"NOT AVAILABLE": The battery test is not available.
"PRESS <ENTER>": Press <ENTER> to start the battery test.
"EXECUTING": The battery test is running.
"SUCCESSFUL": The battery test has been successful.
"NOT SUCCESSFUL": The battery test has not been successful.
Screens 1.6, 1.8 and validation screen (1.7 / 1.9): to acti-
•
vate and deactivate the Smart ECO Mode operating, described
in section 6.7 respectively.
7.3.3. ''MEASUREMENT'' level (screen menu 2.0).
See fig. 46.
Due to the four different factory settings of the UPS:
Three phase input / Three phase output (III/III).
1.
Three phase input / Single phase output -N- (III/I).
2.
Single phase input /Single phase output -L- (I/I).
3.
Single phase input /Three phase output -M- (I/III).
4.
... the quantity of displays screens and their respective measure-
ments can vary depending on each case.
()
BATTERY TEST
()
<status>
screen 1.5
Screens 1.1 and 1.3 changes in
the diagram, depending on the
status of the equipment.
The same happens with the
screens 1.6 and 1.8. Depen-
ding on the Smart Eco-mode
status, are exchanged.
(ESC)
()
SMART ECO-MODE
()
<ENT> TO ACTIVE
screen 1.6
(ENT)
<ENT> TO CONFIRM
<ESC> TO CANCEL
screen 1.7
(ENT)
SMART ECO-MODE
<ESC> TO DEACTIVE
screen 1.8
(ESC)
<ENT> TO CONFIRM
<ESC> TO CANCEL
screen 1.9
(ENT)
SLC CUBE3+ PS UNINTERRUMPTIBLE POWER SOURCE
(ESC)
139