6. OPERATING.
In this section, it is described the procedure to
commissioning and shutdown the equipment,
nevertheless depending on the control panel included
in the equipment, alphanumerical or touchscreen, the
procedure will be different. Proceed according to the
control panel built in the unit.
For more information about the alphanumerical screen,
consult section 7 and for touch screen consult the at-
tached document EL064*01 in the CD/Pendrive.
During the description of this section, it is detailed the pro-
cedure to follow to get the different functionality, consid-
ering a system of «n» equipments connected in parallel.
If in your case, it is available only one UPS from SLC CUBE3+
PS, series, proceed in the same order, but simplifying the oper-
ating for a single unit.
As it has been stated before, it is advisable to have an
external manual bypass panel board equipped with
input, output, static bypass (CUBE3+ B version only) and
manual bypass protections, in single installations.
For parallel systems, more than recommended it is con-
ˆ
sidered essential, to have a protection panel.
The switches from the panel allows both isolating
each UPS of the system in a single way against any
failure and feeding the loads with the rest of the
equipments.
Also, it is a safety precaution measures for the main-
tenance personnel of T.S.S., because it allows making
the needed tasks with no risk of electrical shock.
Therefore it has been considered appropriate and naturally,
to contemplate in the instructions of the equipment, the oper-
ating of a system with «n» equipments connected in parallel
with their respective external manual bypass panel board as it
is shown in the «Recommended installation» documentation
included in the CD/Pendrive.
This panel board allows isolating each equipment individually
in case of fault and removing it without any difficulty for its
reparation or replacement. Also, the included manual bypass
switch makes easier the preventive maintenance tasks or in-
tervention over the complete system, supplying the voltage to
the loads directly from mains, on the «bypass» mode oper-
ating, meanwhile the input voltage is available.
In those installations without the external manual bypass
panel board, omit the actions and steps that involve the ma-
noeuvring of their switches.
6.1. RELEVANT PRELIMINARY
CONSIDERATIONS .
It is very important to always operate in the established order
in the described instructions in the next sections, by respecting
the sequence of the switches in relation to its function.
So, i.e. in parallel system based on four equipments, when it is
stated to turn on the «Input» mechanisms, the order of turning
USER'S MANUAL
on them will not matter, but any other switch with different
function as it could be «Output» switch will not be turned on,
till is stated.
Unlike other UPS structures, where the «Master» and «Slave»
equipments are preset strictly from factory, conditioning the
order of start up and shutdown, the new SLC CUBE3+ PS
series is managed by a more flexible hierarchy according to
the operating mode that it is.
6.2. UPS OR SYSTEM START UP.
6.2.1. Controls before starting up.
Make sure that all the connections have been made correctly
and are sufficiently tight, respecting the labelling of the equip-
ment and instructions of section «5.- Installation and connec-
tion of the unit»
Check that the UPS or each UPS switches and the batteries
cabinet or cabinets, as well as the switchgear panel board are
turned (position «Off»).
Be sure that all the loads are turned «Off».
6.2.2. Start up procedure.
6.2.2.1. First start up procedure.
When commissioning an equipment for first time, the instal-
lation menu is automatically triggered in the control panel, by
default it is displayed in «English» language. By means of this
menu, the following parameters can be set: language, time and
date, nominal operating voltage and frequency of the equip-
ment.
Although depending on the UPS model, the control panel can
be alphanumerical or touchscreen, the graphics can differ but
the quantity of parameters to set are the same. In the first
case, each one of them are selected and entered in separate
menus through chained screens and in the second one, they
are displayed through a single screen by means of drop down
fields to select the several input figures.
For parallel systems, repeat the steps for each one of
them that it makes up, being able to do it in all of them
at the same time or chronologically one by one.
Supply input voltage to the switchgear panel board.
Turn «On» the input switch or switches of the panel board.
Turn «On» the UPS input switch (Q1a) or from each equipment
that the systems is make up.
In equipments with alphanumerical display, the following
message will be displayed for a few seconds:
CONFIGURATION
MENU
and the acoustic alarm will beep every 5 sec. Next the fol-
lowing message will be displayed in the LCD panel:
SLC CUBE3+ PS UNINTERRUMPTIBLE POWER SOURCE
125