If the equipment or parallel system has an outgoing distribu-
tion, turn its switches «On».
Start up the loads to be supplied in a progressive way. The joint
is started up completely, and the loads are protected through
the UPS or UPS parallel system.
After the first start up, the usual start up/shutdown opera-
tion of an equipment or parallel joint will be done by means
of the keypad of the control panel (PC). In parallel systems,
will be needed to act over one of them only.
Consider that the UPS or system will still be supplying output
voltage, it does not matter the status of the own inverter or
inverters:
Shutdown, from static bypass.
ˆ
Started up, from inverter (On-line mode).
ˆ
Started up, from static bypass (on Smart ECO Mode).
ˆ
6.2.2.3. Daily start up procedure, for equipments
with touchscreen.
When coming from section 6.2.2.1, the first three steps will be
skipped, because they have been already done in the first commis-
sioning. For the daily start up procedure starting from equipment/s
shutdown completely, make all the actions next stated:
Feed input voltage to the protection panel.
Turn the input switch or switches «On», depending if it is a
single equipment or parallel system.
Turn the input switch (Q1a) of the UPS or each UPS «On».
The touch screen from control panel (PC) of each equipment
will be triggered automatically.
A screen like the one shown next, as mere example, will be
displayed, where depending on the typology of the input and
output mains, single or three phase, the availability or not of
the separate bypass line and depending on its status, the
single line diagram will vary according to them, stating the
voltage figures in each case.
Log In
Input Frequency
50.1 Hz
L1
226.5 V
L2
227.3 V
L3
228.7 V
Battery Temperature
31.6 °C
Measures
Alarms
Status & Control
(*) Information represented in systems to operate in parallel only.
Parallel Id. 1. It informs about the address of each UPS
with one character. In the example is 1.
Output switch: Opened. It informs about the position of
the UPS and/or protection panel output switch, with two
status «opened» or «closed» (it is compulsory to connect
the auxiliary contact of the output switch of the panel
according to the indications stated in section 5.2.9.2.).
Fig. 45. Example screen about the touchscreen panel (PC).
130
(*)
28 / 11 / 2016
22 : 27 : 23
Output Frequency
50.0 Hz
Output load
Out SW: Open
L1
230.0 V
L2
L1 : 80.2 %
230.0 V
L2 : 83.5 %
Parallel Id. 1
L3
L3 : 81.9 %
230.0 V
TOTAL: 81.8 %
Rated Values
Plots
Advanced
If during the start up procedure, the «Alarm» icon was
ON in red colour in the lower row of main menu, check
the cause, because if the phase rotation is wrong, the UPS will
not be able to start up.
Always together with any triggered alarm there will be
an acoustic alarm of a single modulation and intensity.
Proceed as follows:
Touch over the «Alarm» icon
ˆ
Check, if the «Phase rotation: UPS Start up disable» is dis-
ˆ
played.
To acknowledge and silent any alarm, touch over
ˆ
the «Alarm acknowledgement» icon
If this situation happens in a single UPS of the parallel
ˆ
system, turn the input switch (Q1a) of the equipment
and the switch of the protection panel «Off». Swap two
phases of the UPS input terminal strip and leave the rest
one in the same order and repeat the start up procedure
already described.
If this situation happens in all the equipments of the par-
ˆ
allel system, turn the input switch of each UPS (Q1a)
and the input switches of the protection panel «Off».
Swap two phases of the input protection panel and leave
the rest one in the same order and repeat the start up
procedure already described.
In equipments or systems with separate bypass line SLC
CUBE3+ PS B:
Turn the bypass switches of the panel to «On».
ˆ
Turn the bypass switches of each UPS (Q4a) to «On».
ˆ
If during the start up procedure, the «Alarm» icon
ˆ
was ON in red colour in the lower row of main
menu, check the cause, because if the phase rotation is
wrong, the UPS will not be able to start up.
Proceed as follows:
ˆ
Touch over the «Alarm» icon .
Check, if the «Phase rotation: UPS Start up disable» is
displayed.
If this situation happens in a single UPS of the parallel
system, turn the bypass switch (Q4a) of the corre-
sponding equipment and the switch of the protection
panel «Off». Swap two phases of the UPS bypass ter-
minal strip and leave the rest one in the same order
and repeat the start up procedure already described
in the three previous steps.
If this situation happens in all the equipments of the
parallel system, turn the input switch of each UPS
(Q1a) and the input switches of the protection panel
«Off». Swap two phases of the input protection panel
and leave the rest one in the same order and repeat
the start up procedure already described
If this situation happens in all the equipments of the
parallel system, turn the bypass switch of each UPS
(Q1a) and the bypass switches of the protection
panel «Off». Swap two phases of the bypass protec-
tion panel and leave the rest one in the same order
.
.