Required service
Storage, transportation
Installation, dismantling, repair, maintenance.
Re-commissioning after installation of extra
components or modification. Inspection.
First commissioning of configured control unit
(generic), re-commissioning after power cut, operation
(work on the terminal and SPC control unit)
Electrical Installation
Initial and re-inspection of electrical systems
Inspection before commissioning and re-inspection of
pressure equipment
4.3
Staff qualification
Operating instructions are transferred by Flamco representatives or others assigned by them during delivery negotiations or on
demand.
Training for the required services, installation, dismantling, commissioning, operation, inspection, maintenance and repair are part of
the training / further education for service engineers of the Flamco branch offices or named service contractors.
Such training covers information about on-site requirements rather than performance.
On-site services include transportation, the preparation of an operations room with the requisite foundation engineering to
accommodate the system, and the requisite hydraulic and electrical connections, the electrical installation for the power source of the
degassing equipment and installation of the signal leads for the IT equipment.
4.4
Intended use
Degassing and topping-up closed water heating and cooling water systems in which temperature-affected changes to the volume of
the process water (heat carrier) occur.
The water heating systems are subject to EN 12828 with a maximum operating temperature of 105 °C.
The use of the degassing system in similar plants (e.g. heat transfer systems for process industry or technologically conditioned heat)
may require special measures.
4.5
Incoming goods
The items delivered must be compared against the items listed on the shipping note and inspected for conformity. Unpacking,
installation and commissioning may be started only once the product has been checked to conform with the intended use as
stated in the order process and contract. In particular, exceeding the permissible operating or design parameters may lead to
malfunctioning, component damage and personal injury.
If not in line with conformity or if the delivery is incorrect in another way, the product must not be used.
4.6
Transportation, storage, unpacking
The equipment is delivered in packing units in compliance with the contractual specifications, or requirements for specific
transport methods and climate zones. They meet the requirements of the Flamco STAG GmbH packaging guidelines as a minimum.
In accordance with these guidelines, the degassing systems are supplied stored on special pallets. These pallets are suitable for
transportation with suitable fork-lift trucks. The forks must be set to the widest possible outer dimensions in order to prevent the
load from tipping. The goods delivered must be moved in the lowest possible setting of the lifting equipment and perpendicular to
the forks.
If the packages are suitable for lifting gear, they are marked at the appropriate lifting points.
Important note: Transport the packed goods as close as possible to the envisaged set-up location and make sure there is a
horizontal, solid surface on which the goods can stand.
Caution: Use an approach that prevents uncontrolled falling, sliding or tipping over. The goods may also be warehoused in their
packaging. Stacking of the equipment is to be avoided. Use only permitted lifting gear and safe tools, and wear the required personal
protective equipment.
4.7
Operations room
Room which meets the terms of the applicable European regulations, European and harmonised standards and applicable technical
regulations and the guidelines of professional associations for the field concerned. Where the use of Vacumat Eco is concerned,
these rooms generally have equipment for heat generation and distribution, water treatment and top-up, power supply and
distribution, and measurement, control and information technology.
Access for unqualified and untrained persons must be restricted or forbidden.
Professional group
Logistics, transport, warehousing
Installation and building services
Electrical engineering
Installation and building services
engineering performed in the
context of technical inspection.
Relevant qualifications
Transport and warehousing specialist
HVAC specialist.
People with operations room
clearance with knowledge gleaned
from this guide.
Specialist in electrical engineering /
installation
Qualified person (QP) with
certification in Electrical Engineering
Qualified Person (QP)
7