Information About Installing And Putting The Lz 70 P Into Service Without A Motor - Phoenix Mecano RK Rose+Krieger LZ 70 P Notice D'assemblage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7. Life Phases
7.3.1 Information about installing and putting the LZ 70 P into service
without a motor
No cleaning agents may be allowed to enter the bearings.
When mounting gear wheels or motor adapters, the drive shaft should not be hit or knocked.
Design measures should be taken to prevent potential malfunction of the limit switch: The
relevant stop positions must be set up as required. Particularly in the case of overhead mount-
ing or
if there is tensile load, an external extension safeguard must be provided.
Lateral forces must not lead to toppling. No risk must arise from the electric cylinder if the
mains plug is pulled out.
The axial push rod safety mechanism 1 must only be removed after the motor is fitted.
If the push rod safety mechanism is removed prematurely, the push rod can move in an un-
controlled way.
When installing/removing the drive (motor assembly), the push rod must be secured to pre-
vent it moving..
Motor/gear flange requirements
Fmin. = 600 N / service life at least 10,000 h
54
1

Publicité

Table des Matières
loading

Table des Matières